Kharadi Bridge Opens, Hadapsar Station Road Gets a Push: What Pune's August 2026 Road Works Mean for Civil Students
On August 15, 2026, the Kharadi-Keshav Nagar bridge was directed to be opened for public traffic, giving East Pune a new river crossing that has been years in the making. In the same week, Pune Municipal Corporation officials inspected ongoing works and pushed for faster progress on the Hadapsar Station Road project and on North Main Road widening between ABC Farm Chowk and Tadigutta Chowk. None of these are single, isolated announcements — they are three live construction sites within Pune's city limits, running at the same time, and every one of them needs engineers who can work from survey and design data, not just a finished 2D plan.
What's Actually Happening on the Ground
The Kharadi-Keshav Nagar bridge connects fast-growing residential and IT-adjacent pockets of East Pune across the river, easing a crossing that has been a known bottleneck for commuters. Hadapsar Station Road and the North Main Road stretch, meanwhile, are being widened and upgraded as part of PMC's broader push to relieve pressure on some of the city's most congested corridors. Officials have directed these to move on an accelerated schedule, which in practice means design, survey and execution teams are all under pressure to deliver faster than the usual timeline.
Why These Projects Run on Civil 3D and Survey Data, Not Just AutoCAD
Bridge approaches, road widening cross-sections, drainage realignment and utility shifting are not drawn as flat, disconnected plan sheets on a project like this. They are modelled as a connected corridor surface, where a change in one cross-section automatically updates earthwork quantities and adjoining sections. That is Civil 3D work, not 2D AutoCAD drafting, and it is a genuinely different skill from what most diploma and degree programmes teach as "CAD." Contractors and PMC-adjacent consulting teams executing projects like this need people who can read and update that surface model against site conditions as work progresses.
Hadapsar's Own Push — Why This Is Directly Relevant If You Train Here
Hadapsar is not an abstract location for this — it is one of ABC Trainings' own centres, and Hadapsar Station Road being fast-tracked means the design and execution activity generating this kind of hiring demand is happening within walking distance of where students are training. That is a rare, direct overlap between where you study and where the work actually is. For the bigger picture of how road and bridge projects across the city are creating openings, see our guide to BIM for Pune's bridge and flyover construction boom and our coverage of the Pune Ring Road's Civil 3D and BIM career angle.
What Civil Engineering Students Should Actually Do About This
You do not need to wait for a job posting that mentions these specific projects by name. What you can do now is make sure you are not limited to 2D AutoCAD drafting when design consultants and contractors on projects like these are hiring — Civil 3D corridor modelling, survey data handling, and where relevant, BIM coordination for structures like bridge approaches, are the skills that get you considered. Our civil engineer jobs and BIM salary guide for Pune breaks down realistic starting pay for these skill combinations.
Get Brochure + Fees + Batch Dates on WhatsApp
Free 1:1 counselling. Placement track record. CMYKPY/PMKVY eligibility check.
💬 WhatsApp 7774002496📞 Call 7039169629Visit Our Centers
- Wagholi (Pune): 1st Floor, Laxmi Datta Arcade, Pune-Ahilyanagar Highway. Call 7039169629
- Hadapsar (Pune HQ): 1st Floor, Shree Tower, opp. Vaibhav Theater, near Bloom Hotel, Magarpatta. Call 7039169629
- Cidco (Chh. Sambhajinagar): Kalpana Plaza, opp. Eiffel Tower, N-1 Cidco. Call 7039169629
- Osmanpura (Chh. Sambhajinagar): S.S.C Board to Peer Bazar Road, near Jama Masjid. Call 7039169629
- Sangli: Shubham Emphoria, 1st Floor, Above US Polo Assn., Sangli-Miraj Rd, Vishrambag. Weekend batches available. Call 7039169629


