PLC SCADA Complete Tutorial Guide 2026: Industrial Automation Basics to Live Projects (Updated August 2026)
India's AURIC industrial node in Sambhajinagar is attracting Rs.71,343 crore of investment and 62,405 jobs — and every automation system in those factories runs on PLC and SCADA. Here's the thing: most engineering graduates understand the theory but have never touched a Siemens S7-300 or opened TIA Portal. This complete guide covers the entire ABC Trainings PLC and SCADA video series — from what industrial automation actually is, through ladder logic, timers, comparators, memory addressing, interlocking, all the way to building live SCADA projects in Siemens WinCC. You'll learn what a trainer with 15 years of industry experience at Siemens and beyond actually teaches in the classroom.
- PLC (Programmable Logic Controller) is the automation brain of every modern factory — it replaces hundreds of relay panels with one programmable computer running on 24V DC
- This guide covers the complete Siemens S7-300 and TIA Portal course: ladder logic, timers (5 types), counters, comparators, interlocking, memory concepts, and SCADA WinCC visualization
- Real careers: PLC/SCADA engineers at Skoda VW Shendra (Plot A-1/1), Bajaj Waluj (Plot G-137), Endurance MIDC E-92, Toyota Kirloskar AURIC — Rs.2.8-3.5 LPA fresh, Rs.4.5-7 LPA with 2-4 years
- CMYKPY scheme pays Rs.6,000-10,000/month during your industrial automation training — making this course nearly self-funding for Maharashtra students
- Free video series by ABC Trainings on YouTube — watch each episode in sequence, practice in our lab, and get placed through our industry network in Pune, Sambhajinagar, and Sangli
What Is Industrial Automation? How PLC Replaced 10,000 Wires
Before PLC, controlling a factory meant rooms full of relay panels, mechanical timers, and contactors that wore out and needed physical rewiring for every logic change. What most people don't realize is how radical the shift was: a modern Siemens S7-300 PLC replaces all of that with one programmable unit you can hold in one hand. In ABC's opening video, the trainer explains automation simply: automation means auto plus motion — the process runs by itself. Semi-automation means 50% human, 50% machine. Full automation means zero human intervention during the process. Industrial automation uses PLCs to control sensors, motors, drives, and actuators: filling bottles, controlling conveyor speeds, managing furnace temperatures, sequencing assembly lines. Think of the PLC as the exam supervisor — it reads all the inputs, follows the program logic, and drives the outputs without getting tired.
▶ Watch this step free on ABC's YouTube: Introduction to Industrial Automation — What Is PLC and Why It Matters

Introduction to PLC — Programmable Logic Controller Explained
PLC stands for Programmable Logic Controller — an industrial computer designed to replace relay-based hardwired control circuits. The definition from the course: PLC is a combination of software and hardware — a digitally operating electronic operator that controls machinery in factories, conveyor systems, boilers, and process plants. The specific model in this course is the Siemens S7-300 313C CPU, running on 24V DC supply with 24/16 digital I/O and analog ports. Control logic is stored in program memory (Step 7 OB1/FB/FC blocks) and executed cyclically — reading all inputs, executing the ladder logic, writing all outputs, repeat. Starting salary for a fresh PLC engineer at Maharashtra factories (Skoda VW Shendra, Bajaj Waluj, AURIC companies): Rs.2.8-3.5 LPA. After 2-4 years as automation engineer: Rs.4.5-7 LPA.
▶ Watch this step free on ABC's YouTube: Introduction to PLC — What Is a Programmable Logic Controller?
| Role | Experience | Salary (Rs. LPA) | Typical Employers |
|---|---|---|---|
| PLC Trainee / Panel Wiring | 0-1 yr | Rs.2.5-3.5 | Bajaj Waluj, Endurance, AURIC SMEs |
| Automation Engineer | 2-4 yrs | Rs.4.5-7 | Siemens, Bosch, ABB, Skoda VW Shendra |
| SCADA / Controls Engineer | 3-5 yrs | Rs.6-10 | Emerson, Honeywell, Forbes Marshall |
| Senior Automation Lead | 5+ yrs | Rs.10-16 | Siemens India, ABB, Yokogawa |
PLC/SCADA salary data 2026 — AmbitionBox/PayScale/Glassdoor estimates for Maharashtra industry
PLC Input Field Devices: Switches, Push Buttons, Limit Switches and Proximity Sensors
Input field devices are the PLC's senses — every automated action starts with an input signal. The course covers: push buttons (NO contact normally open — used to start motors or trigger sequences; NC contact normally closed — used for stop or safety), limit switches (detect when a mechanical component reaches its travel limit — essential on conveyors, presses, and linear actuators), float switches (liquid level detection for tanks and sumps), proximity sensors (non-contact detection using inductive or capacitive principles — the industry standard for counting parts on a production line), and drum switches for multi-position selection. Understanding NO and NC contact logic is not optional: every industrial wiring diagram, every troubleshooting job starts here. The trainer walks through real connection diagrams showing L1-Neutral wiring with NO and NC contacts — exactly what you face when standing in front of a control panel at Endurance, Bosch, or Toyota Kirloskar.
▶ Watch this step free on ABC's YouTube: PLC Input Field Devices: Switches, Push Buttons and Proximity Sensors Explained

PLC Output Field Devices: Relays, Contactors, Motors and Solenoid Valves
Output field devices are what the PLC actually controls — the actuators that move, heat, open, close, or signal. Relays (protective switching devices: 24VDC coil energizes, creates electromagnetic field, armature moves, contact closes — load circuit connects), contactors (rated for motor-starting current — used for repeated high-current switching of motors, heaters, and pumps), solid-state relays (no moving parts, semiconductor switching for high-cycle applications), solenoid valves (convert electrical signals to pneumatic or hydraulic action — everywhere in pneumatic systems), indicator lamps (status feedback on control panels). The fundamental principle: PLC output goes HIGH, relay coil energizes, electromagnetic field pulls armature, contact closes, load gets power. PLC output goes LOW, spring returns armature, contact opens, load drops. This electrical-to-mechanical bridge is at the heart of every industrial control panel you will ever commission, troubleshoot, or maintain.
Ladder Logic Programming: The Language Every PLC Engineer Must Know
Ladder logic is the primary programming language of PLCs — it was designed to look like electrical relay-circuit schematics so that electrical engineers could transition without learning a new paradigm from scratch. Structure: two vertical power rails (left = live, right = neutral), horizontal rungs connecting them, contact symbols (NO and NC) representing inputs, and coil symbols representing outputs. AND logic in ladder: contacts in series (both must be closed for current to flow). OR logic: contacts in parallel (either path allows current). Latch (SET): coil turns ON and stays ON. Unlatch (RESET): coil turns OFF. In TIA Portal, the trainer demonstrates live: drag an NC contact from bit logic instructions, assign it I0.0, drag an NC contact for I0.1, connect to output coil Q0.0, name it Q0.0 — compile, download, go online, and monitor. The orange highlight on the monitoring screen shows live signal states. Trust me: the first time you see a physical output relay click because your ladder rung fired, everything clicks into place.
Working with TIA Portal Software: Setting Up Your First Siemens Project
TIA Portal (Totally Integrated Automation Portal) integrates Siemens Step 7 programming with hardware configuration, diagnostics, and SCADA in one environment. The course uses version 15.1 (current industry versions: 17 and 18). The practical workflow: Open TIA Portal → Create New Project → name the project → Configure Devices → Add New Device → select Controller → navigate to CPU 315-2 PN/DP under S7-300 → add Power Supply module → add Digital I/O modules → add Analog I/O modules → save → compile → load to CPU (via MPI communication). The orange indicator on the monitoring screen confirms: project loaded, CPU running. First project: basic ladder rung with one NO contact (push button start) in series with one NC contact (stop) driving one coil (motor output) — the classic direct-on-line motor starter in PLC logic. When you can write, compile, download, and test this in 20 minutes, you're ready for more complex sequences.
▶ Watch this step free on ABC's YouTube: Working with TIA Portal: Create Your First Siemens PLC Project Step by Step
PLC Memory Concepts: Bit, Byte, Word and Double-Word Addressing
PLC memory addressing is where most self-taught programmers get stuck — once you understand it, every advanced concept unlocks. The Siemens S7-300 memory map: M0.0 to M0.7 = one byte (8 individual bit addresses). M1.0 to M1.7 = another byte. Two bytes combined = MW0 (Memory Word, 16 bits). Two words combined = MD0 (Memory Double Word, 32 bits). Address range: MD0 through M124. Why memory bits matter in practice: you can latch intermediate logic states, create step-sequencing programs, and drive multiple outputs from a single condition — without needing physical I/O for every intermediate state. The trainer demonstrates: use M0.0 as a latch bit → button press sets M0.0 → M0.0 holds the motor ON even after button released → a second rung uses M0.0 to also drive a status indicator lamp and an alarm output. This single-input-multiple-output pattern using memory is the foundation of every sequential process control program you will write in industry.
PLC Timers: Five Types with Practical Siemens S7-300 Examples
Timers in PLC programs control when outputs turn on and off — essential for every timed industrial process: heater warm-up delay, motor ramp start, conveyor speed transition, alarm acknowledgment delay. The Siemens S7-300 has five timer types: Pulse (TP — output on for preset duration regardless of what the input does), On-Delay (TON — output turns ON after input has been ON for the preset time), Pulse Extended (TE — extended pulse that runs to completion even if input drops), On-Delay Extended (TDE), and Off-Delay (TOF — output stays ON for preset time after input drops, protecting motors from rapid cycling). The trainer demonstrates practically: create timer project → add CPU → write rung: push button I0.0 → TON T0 preset 5 seconds → output Q0.0 → compile → download → go online → press button and observe: output Q0.0 activates after exactly 5 seconds. In industry, timers prevent motor hunting (rapid start-stop that burns contactors), protect cooling systems, and sequence multi-step processes.
▶ Watch this step free on ABC's YouTube: PLC Timers: All Five Timer Types Explained with Live Siemens S7-300 Examples
Counters and Comparators: Counting, Comparing and Controlling Outputs
Counters count discrete events — parts on a conveyor, bottles filled, machine cycles. The Up Counter (CTU) increments a count register each time the input pulse goes from 0 to 1. But counting alone is not enough — you need to know when you've counted enough, which is where comparators come in. Six comparator types: equal (=), not equal (≠), greater than (>), less than (<), greater than or equal (≥), less than or equal (≤). Practical program from the video: counter C0 counts parts on a conveyor → comparator checks if C0 = 10 → when true, activate diverter relay Q0.1 and reset counter → next batch starts. This count-compare-act-reset pattern is one of the most common PLC program structures in packaging, bottling, and assembly lines across Maharashtra's MIDC industrial zones. The trainer walks through all six comparator types in TIA Portal, linking the counter output register to the comparator input.
▶ Watch this step free on ABC's YouTube: PLC Comparator Functions: Practical Counting and Control Logic
Latching, Unlatching and Interlocking: Safety Logic in PLC Programs
Latching and interlocking are the two safety fundamentals every PLC programmer must master before working on real machines. Latching (OTL — Output Latch): the output is SET ON and stays ON even after the input condition disappears — it is held latched until explicitly unlatched (OTU — Output Unlatch). This is how motor start-stop works in real panels: press START momentary push button → motor output latches ON via an M-bit → press STOP → unlatch clears the bit → motor off. Without latching, a momentary button cannot hold a motor running. Interlocking prevents two conflicting outputs from being simultaneously active — the canonical example: motor forward (Q0.0) and motor reverse (Q0.1) must never both be ON simultaneously or the motor windings short. The rung for Q0.0 has an NC contact of Q0.1 in series (if reverse is ON, forward is blocked). The rung for Q0.1 has an NC contact of Q0.0 in series. This electrical interlocking in the PLC logic is combined with mechanical interlocking (contactors's NC auxiliary contacts in series with each other's coils) for dual-layer safety — what most engineers miss is that both layers are required per industrial safety standards.
Introduction to SCADA and Siemens WinCC: Visualizing Your Factory
SCADA (Supervisory Control and Data Acquisition) is the visualization layer above the PLC. The PLC controls the physical process; SCADA displays it, logs it, raises alarms, and gives operators visibility into what's happening across the entire plant from one screen. Siemens WinCC is the SCADA software taught in this course. Setting up WinCC communication with the Siemens S7-300: open TIA Portal → add PC System → Advanced RT → configure an Ethernet connection between WinCC and the PLC controller → compile and save. Tags are the data bridge: every PLC memory address (M-bit, I-bit, Q-bit, counter value, timer value) gets a WinCC tag that maps to it. On the SCADA screen, graphic objects (pump symbols, motor icons, valve animations, level bars) are linked to these tags. When the PLC sets Q0.0 HIGH (motor running), the WinCC motor icon turns green in real-time. When an alarm bit sets in the PLC, the SCADA alarm window triggers. The trainer covers the complete workflow: create graphics in WinCC → add objects from library → link to PLC tags → run simulation → observe real-time animation as the PLC program executes. This is what Skoda VW and Toyota AURIC control room operators see every shift.
PLC and SCADA Career Guide 2026: Salaries, Companies and Jobs in Maharashtra
PLC and SCADA engineers are among the most consistently hired technical profiles across Maharashtra's industrial belt — because automation never stops expanding and the skill gap is genuine. NASSCOM-Deloitte projects demand for 1.25 million AI and automation professionals in India by 2027, and industrial PLC engineers are directly in that count. Starting salaries in 2026: fresh PLC/SCADA engineers at Pune-region plants earn Rs.2.8-3.5 LPA. After 2-4 years with live project experience: Rs.4.5-7 LPA. Senior automation engineers at Siemens India, ABB, Emerson, Honeywell: Rs.10-16 LPA. Specific Sambhajinagar recruiters: Skoda VW Shendra (Plot A-1/1), Bajaj Waluj (Plot G-137), Endurance Technologies (E-92), Hyosung Bidkin (Rs.3,000 crore investment), Toyota Kirloskar AURIC, Ather Energy Bidkin. Sangli-Kolhapur: SMMMA 250+ industries, Bharat Forge Kagal (automation/CNC overlap). The ABC Trainings PLC/SCADA curriculum covers the full Siemens S7-300 platform, TIA Portal programming, SCADA WinCC, and live project builds on actual hardware — the same stack used in AURIC-area factories. Our Osmanpura and Cidco centers (Sambhajinagar) run batches specifically for placement in the AURIC industrial zone.
The Mukhyamantri Yuva Karya Prashikshan Yojana 2026 covers industrial automation and electrical training. Eligible Maharashtra youth (18-35) get Rs.6,000/month (12th pass), Rs.8,000/month (ITI/Diploma) or Rs.10,000/month (graduate) stipend during approved training. ABC Trainings is an approved partner. Walk into any center and we process your CMYKPY registration same day — call 7039169629 to confirm batch dates and eligibility.
Get the Industrial Automation Brochure + Fees + Batch Dates on WhatsApp
Free 1:1 counselling. Placement track record. CMYKPY/PMKVY eligibility check.
💬 Get Brochure on WhatsApp📞 Call 7039169629About the author: Sunil Wagh. 15 yrs PLC/SCADA/EPLAN training, ex-Siemens India.
Visit Our Centers
- Wagholi (Pune): 1st Floor, Laxmi Datta Arcade, Pune-Ahilyanagar Highway. Call 7039169629
- Hadapsar (Pune HQ): 1st Floor, Shree Tower, opp. Vaibhav Theater, Magarpatta. Call 7039169629
- Cidco (Chh. Sambhajinagar): Kalpana Plaza, opp. Eiffel Tower, N-1 Cidco. Call 7039169629
- Osmanpura (Chh. Sambhajinagar): S.S.C Board to Peer Bazar Road, near Jama Masjid. Call 7039169629
- Sangli: Shubham Emphoria, 1st Floor, Above US Polo Assn., Sangli-Miraj Rd, Vishrambag. Weekend batches available. Call 7039169629
FAQs
What software is used in the ABC Trainings PLC SCADA course?
The course uses Siemens Step 7 and TIA Portal (version 15.1 and above) for PLC programming, and Siemens WinCC for SCADA. Hardware is the Siemens S7-300 series (CPU 313C and 315 2PN/DP) — the industry-standard platform used in Maharashtra manufacturing plants. Both software and hardware are the same tools you will use on the job at Siemens-equipped factories.
How long does it take to learn PLC and SCADA to a job-ready level?
A structured course covering industrial automation basics, PLC ladder logic, timers, counters, comparators, interlocking, and SCADA WinCC takes 3-4 months (80-120 hours of instruction and lab time). After completing the ABC Trainings curriculum and building two or three live projects, you are ready for entry-level PLC operator and automation engineer roles. Call 7039169629 for current batch schedule.
Which companies hire PLC SCADA engineers in Pune and Sambhajinagar?
Key Maharashtra employers for PLC SCADA engineers: Bajaj Auto Waluj (Plot G-137, Sambhajinagar), Skoda VW Shendra AURIC (Plot A-1/1), Endurance Technologies MIDC E-92, Toyota Kirloskar AURIC, Ather Energy Bidkin, Hyosung Bidkin, Bosch Pune, and hundreds of MIDC vendor companies in Waluj and Kupwad. ABC Trainings has placement partnerships with AURIC-area companies from our Osmanpura and Cidco centers.
Can I get a government stipend while doing PLC SCADA training at ABC Trainings?
Yes. PLC/SCADA industrial automation training at ABC Trainings is eligible for the CMYKPY (Mukhyamantri Yuva Karya Prashikshan Yojana) stipend — Rs.6,000-10,000 per month depending on your education level (12th pass: Rs.6K, ITI/Diploma: Rs.8K, Graduate: Rs.10K). Register at cmykpy.mahaswayam.gov.in. Our counsellors complete your registration in the first session visit.


